
New Product (Fyrelogix Fail Safe BMS)
January 15, 2013
60T/H boiler burners commissioned in Middle East
February 19, 2014Credfeld successfully trialed it’s Air Atomised Burner on a UK Coal fire Power Station. The trial was to demonstrate the Air Atomised burner could be turned down from 700Kg/hr to 220Kg/hr whilst maintaining total combustion of the Oil. The test were successful and demonstrated a large fuel oil saving under certain firing conditions of the boiler. Pic SDC10606





